During the operation of a single beam crane, it is necessary to follow the operating procedures to avoid affecting equipment use due to misoperation. Below, the Shandong single beam crane manufacturer has summarized several precautions for operating a single beam crane, hoping to be helpful to everyone.
Single beam bridge crane is a lifting equipment that is horizontally mounted over workshops, warehouses, and material yards for material lifting. Due to its two ends located on tall cement columns or metal supports, the shape resembles a bridge. The bridge of a single beam bridge crane runs longitudinally along the tracks laid on both sides of the elevated structure, making full use of the space below the bridge to lift materials without being hindered by ground equipment. It is a widely used and numerous lifting machinery. Important tools and equipment for achieving mechanization and automation of production processes in modern industrial production and lifting transportation. So single beam bridge cranes are widely used in departments and places such as indoor and outdoor industrial and mining enterprises, steel and chemical industry, railway transportation, ports and docks, and logistics turnover.
1. Before operating a single beam crane, it is necessary to inspect various lifting tools to ensure their integrity and good condition. If the lifting worker has defects, they cannot carry out lifting crane work.
2. Similarly, in a single beam crane, the condition of the rope needs to be checked to ensure that the rope is secure, not loose or broken. If the binding is an object with edges, it is necessary to add protection between the object and the rope to prevent the rope from breaking.
3. The single beam crane needs to pay attention to finding the middle position of the heavy object accurately, and there should be no diagonal pulling phenomenon. For special lifting items, staff should operate from the side.
4. When lifting objects, do not act too hastily. Be sure to wait for a moment and wait until the goods have stabilized before continuing. It is prohibited to place debris or stand on heavy objects. During lifting, no unrelated personnel are allowed to pass under the object.
5. The safety measures for work should be improved, such as wearing safety helmets, having professional personnel provide unified command, and coordinating work among departments. When objects are off the ground, it is necessary to check the safety of steel wire ropes and other components. If it is not safe, stop the machine for inspection.
6. The use of a single beam crane cannot allow the lifted object to stay in the air for a long time.